Notice from the Department of Ecology and Environment of Liaoning Province on Issuing the Work Plan for the Compilation of the 14th Five Year Plan for Water Ecological Environment Protection in Key River Basins, the Work Plan for the Compilation of the 14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province, and the Composition Plan for the Leading Group, Office, and Technical Guidance Group for the Compilation of the 14th Five Year Plan for Ecological Environment Protection in Key River Basins and Sea Areas in Liaoning Province


Notice from the Department of Ecology and Environment of Liaoning Province on Issuing the Work Plan for the Compilation of the 14th Five Year Plan for Water Ecological Environment Protection in Key River Basins, the Work Plan for the Compilation of the 14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province, and the Composition Plan for the Leading Group, Office, and Technical Guidance Group for the Compilation of the 14th Five Year Plan for Ecological Environment Protection in Key River Basins and Sea Areas in Liaoning Province
(Liao Huan Han [2020] No. 58)

Offices of Municipal People's Governments:
According to the relevant provisions of the Environmental Protection Law of the People's Republic of China, the Water Pollution Prevention and Control Law of the People's Republic of China, and the Marine Environment Protection Law of the People's Republic of China, our department will work with relevant departments to organize the preparation of the "14th Five Year Plan for Water Ecological Environment Protection of Key River Basins in Liaoning Province" and the "14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province" (referred to as the "Plan"). In order to prepare the "14th Five Year Plan" for the protection of water ecological environment in key river basins in Liaoning Province, our department has prepared the "14th Five Year Plan for the Protection of Marine Ecological Environment in Liaoning Province", "14th Five Year Plan for the Protection of Marine Ecological Environment in Liaoning Province", and "Composition Plan for the Leading Group, Office, and Technical Guidance Group for the Protection of Ecological Environment in Key River Basins and Sea Areas in Liaoning Province". We are now printing them to you for your support and cooperation.
Liaoning Provincial Department of Ecology and Environment
April 8th, 2020

Work Plan for the Compilation of the 14th Five Year Plan for Water Ecological Environment Protection in Key Watersheds of Liaoning Province
(April 2020)

In order to implement the Water Pollution Prevention and Control Law of the People's Republic of China and in accordance with the requirements of the Technical Outline for the Preparation of the 14th Five Year Plan for Water Ecological Environment Protection in Key River Basins (Environmental Office Water Letter [2019] No. 937) (hereinafter referred to as the "Technical Outline"), and to comprehensively promote the preparation of the 14th Five Year Plan for Water Ecological Environment Protection in Key River Basins in Liaoning Province (hereinafter referred to as the "River Basin Plan"), this work plan is formulated.
1、 Overall requirements
（1） Compilation ideas
 
（2） Principles of Compilation
1. Coordination of the "Three Waters" and systematic governance
Adhere to the scientific concept that mountains, waters, forests, fields, lakes, and grasslands are a community of life, coordinate water resources, water ecology, and water environment, systematically promote industrial, agricultural, domestic, and shipping pollution control, ensure ecological flow of rivers and lakes, protect and restore ecosystems, and prevent and control risks.
2. Highlight key points with limited objectives
Focusing on prominent ecological and environmental issues such as water pollution, ecological damage, and lack of ecological flow around the masses, and linking the goals of building a beautiful Liaoning by 2035 and a socialist modernized strong country by the middle of this century, we propose practical and feasible goals for the 14th Five Year Plan period.
3. Seek truth from facts and adapt to local conditions
Objectively analyze the quality status of the water ecological environment, the foundation of ecological environment protection work, and the current economic and social development status in the province, and systematically design targeted task measures based on the different characteristics of resource endowments in various river basins such as the Liaohe River.
4. Up and down linkage, forming a joint force
Pay attention to the linkage with cities and counties, strengthen departmental linkage, and pool wisdom and efforts. At the provincial level, clarify the overall deployment from top to bottom and strengthen guidance for the formulation of city and county plans. At the city and county levels, attention should be paid to the implementation of lists of problems, causes, goals, tasks, responsibilities, etc. in the planning process.
（3） Work objectives
Complete the preparation of the "14th Five Year Plan" for the protection of water ecological environment in key river basins in Liaoning Province, establish a spatial control system and policy guarantee system for water ecological environment protection in the province, formulate a list of water ecological environment problems and causes in the province's river basins, a list of water ecological environment protection in cities, and a list of engineering projects, and finally present the work results of "one plan, two systems, and three lists" for water ecological environment protection in the province's river basins.
（4） Planning scope and timeline
The scope of the "Watershed Planning" includes all watersheds in the province.
The planning period is from 2021 to 2025, with the benchmark year being 2020.
（5） Technical route
The entire process of planning and formulation integrates water resources, water ecology, and water environment, and analyzes and solves key watershed water ecological environment protection problems according to the framework of "one point, two lines". 'One point' refers to the quality of the water ecological environment; The term 'two lines' refers to pollution reduction and ecological expansion.
The technical roadmap for planning and formulation mainly includes: summarizing the effectiveness and experience of water ecological environment protection during the 13th Five Year Plan period; Systematically analyze the water ecological environment status, identify key areas and issues, and analyze the causes of problems; Fully consider the urgent needs of the masses for the ecological environment, develop an indicator system that coordinates water resources, water ecology, and water environment, taking into account both necessity and accessibility, and scientifically determine goals; Establish a watershed spatial control system based on the concept of "watershed coordination and regional implementation"; Design a planning task system that supports the achievement of goals based on problem orientation and goal orientation, and extract a list of planning projects; Propose policy measures to ensure the smooth implementation of the plan.
2、 Work tasks
（1） Summarize the effectiveness and experience
Based on the assessment of the effectiveness of the pollution prevention and control battle, we will organize and carry out evaluations of the implementation of the "Action Plan for Water Pollution Prevention and Control" and the "Key Watershed Water Pollution Prevention and Control Plan (2016-2020)", and summarize the achievements and experiences of ecological environment protection work during the 13th Five Year Plan period, especially the low-cost, effective, and sustainable governance and protection measures and effective policy guarantee mechanisms.
（2） Clarify the characteristics of the watershed
Starting from the actual situation of each river basin, deeply analyze the prominent problems existing in the basin, clarify the overall layout of ecological environment protection work in the province and each city basin, focus on key areas, key fields, and key industries, highlight the "one river, one policy", and reflect the characteristics of different rivers. The key areas identified by the provincial government, such as Shenyang Economic Zone, Coastal Economic Belt, Northwest Liaoning, and East West Water Diversion, need to clarify the strategic focus of water ecological environment protection during the 14th Five Year Plan period and reflect it in the basin planning.
（3） Strengthen spatial control
Following the concept of "watershed coordination and regional implementation", we aim to connect the water and shore areas, with the goal of protecting the ecological environment function of water bodies and clarifying the responsibilities of administrative jurisdictions at all levels. We will gradually establish a watershed spatial control system that covers the entire province, including five levels: province basin water functional area control unit administrative jurisdiction. Among them, the control unit, as the core level, is a spatial carrier for refining the implementation of the "three water" protection requirements and implementing refined management measures. It is composed of water bodies and their land catchment areas, and further clarifies administrative jurisdiction responsibilities through control sections.
（4） Identify the main issues
Data organization. Collect and organize long-term series data on water resources, water ecology, water environment, economic and social aspects, among which water environment and economic and social aspects mainly collect data from the 13th Five Year Plan period, while water ecology, water resources and other aspects should collect longer time series data. The above data should ultimately be collected into each control unit according to the characteristics of watershed runoff.
Problem analysis. Conduct analysis on issues including water environment status, water resources status, water ecology status, and water environment risks, develop a list of water ecological environment problems, and based on the analysis results of water ecological environment status, focus on prominent water ecological environment problems around the public, and sort out the problem list from four aspects: water environment, water ecology, water resources, and water environment risks.
Cause analysis. Preliminary assessment of the main causes of the problem through water environment quality analysis; By conducting a gap analysis between the current status and requirements of water ecological environment, we aim to deeply analyze the causes of the problems; Determine the cause of the problem based on actual research.
（5） Set planning objectives
Orderly linking the medium - and long-term strategic goals of building a beautiful Liaoning by 2035 and a socialist modernized strong country by the middle of this century, based on the principles of monitoring, statistics, and assessment, reflecting the combination of constraints and guidance, and in accordance with the requirements of "rivers, water, fish, grass, and harmonious human water", establish a planning index system that coordinates water resources, water ecology, and water environment, reasonably determine stage target values by basin, region, and year, ensure the implementation of goals, strive for continuous improvement of water environment quality during the 14th Five Year Plan period, restore the functions of water ecosystems, and basically form a pattern of coordinated promotion of water resources, water ecology, and water environment.
（6） Design and planning tasks
The main tasks of formulating plans include protecting drinking water sources, reducing pollution, ensuring water resources, protecting and restoring water ecology, and preventing and controlling water environmental risks.
Protection of drinking water sources. On the basis of consolidating the achievements of urban drinking water source protection and governance, we will focus on solving the problem of substandard drinking water sources in county-level and above cities, as well as prominent ecological and environmental issues in rural drinking water source protection work.
Pollution reduction. According to the demand for improving the quality of water ecological environment, the system is designed to meet industrial pollution standards, build urban pollution control capacity, improve the level of pollution prevention and control in agriculture and rural areas, and carry out mobile source pollution control tasks.
Water resource security. Based on the analysis of the causes of the problem, with the fundamental starting point of ensuring ecological flow, we will implement tasks such as transforming high water consumption methods, ecological scheduling of gates and dams, and improving the regional recycled water recycling system.
Water ecological protection and restoration. According to the demand for improving the quality of aquatic ecological environment, the protection and restoration tasks of aquatic ecosystems are mainly formulated from the aspects of wetland restoration and construction, river and lake ecological construction, and aquatic organism integrity restoration.
Water environment risk prevention and control. Based on the analysis of the causes of the problem, the planning tasks are mainly designed from two aspects: sudden risk and cumulative risk prevention and control.
（7） Filter planning projects
Based on the problem goal orientation, a project list is proposed for tasks such as standardized construction of drinking water source areas, pollution reduction, ecological flow guarantee, water ecological protection and restoration, and water environment risk prevention and control. The project list should include information such as the construction site, construction scale, and implementation period.
（8） Develop policy measures
To ensure the achievement of planning goals and tasks, establish and improve water ecological environment protection mechanisms from organizational leadership, regulatory standards, economic policies, technological support, supervision and management, and public participation.
3、 Organize and implement
The "Watershed Planning" is a comprehensive plan that involves various functional departments and cities. The provincial and municipal governments serve as the main body of planning preparation, and in accordance with the requirements of the "Technical Outline", they clarify the leading department, establish a coordination mechanism, and jointly promote the preparation of the "Watershed Planning".
（1） Provincial level
1. Organizational Framework
The Provincial Department of Ecology and Environment, together with the Provincial Development and Reform Commission, Provincial Department of Science and Technology, Provincial Department of Industry and Information Technology, Provincial Department of Finance, Provincial Department of Natural Resources, Provincial Department of Water Resources, Provincial Department of Housing and Urban Rural Development, Provincial Department of Transportation, Provincial Department of Agriculture and Rural Affairs, Provincial Health Commission, Provincial Forestry and Grassland Bureau, Provincial Academy of Agricultural Sciences, Provincial Water Resources Management Group and other relevant departments, jointly organized the preparation of the "Basin Plan" and established a coordinated mechanism. Establish a leadership group, leadership group office, and technical group for the preparation of the "River Basin Plan", establish a coordination mechanism for the preparation of the "River Basin Plan", strengthen cross departmental coordination, and overall organize and coordinate the work of preparing the "River Basin Plan".
2. Division of responsibilities
Each functional department shall jointly organize and carry out the planning work, ensure the connection with the relevant industry planning of each department, summarize the achievements and experiences of ecological environment protection during the 13th Five Year Plan period, sort out the prominent problems and causes of water ecological environment protection, propose the goals, indicators, and task measures of water ecological environment protection in the 14th Five Year Plan basin of their department, be responsible for researching and proposing a list of water ecological environment protection engineering projects, guide various cities to carry out basin planning, and cooperate with relevant national departments to carry out national planning research and special studies.
（2） At the municipal level
1. Implement the requirements for planning and preparation related work
Organize the identification and cause analysis of water ecological environment problems within the jurisdiction, and develop a list of water ecological environment problems and their causes. Fully connect with the special plans of relevant departments at the national and provincial levels, propose the key points for water ecological environment protection during the 14th Five Year Plan period in this jurisdiction, prepare a list of water ecological environment protection in the city according to the technical outline requirements, and submit relevant supporting materials and data information.
2. Propose a list of local projects
According to the planning objectives, combined with local characteristics and the needs of water ecological environment governance, protection and restoration, a detailed project list for each city is proposed, and the project task volume and investment demand are calculated.
4、 Schedule arrangement
（1） Work deployment phase (January 2020 April 2020)
Establish a coordination mechanism for the preparation of the 'River Basin Plan', establish a leadership group, leadership group office, and technical group, and issue the '14th Five Year Plan for the Preparation of Key River Basin Water Ecological Environment Protection in Liaoning Province'. Carry out relevant technical training, exchange and other work.
（2） Promotion and Implementation Phase (April 2020 May 2020)
Unified planning foundation. Establish a watershed spatial control system and complete the preliminary division plan of control units for the 14th Five Year Plan. Collect basic data and information, conduct research in various river basins and cities, basically complete the collection and analysis of basic data, and complete the survey form required by the Technical Outline.
Conduct specialized research. Based on the principle of "three water coordination" of water resources, water ecology, and water environment, summarize the effectiveness and experience of water ecological environment protection during the 13th Five Year Plan period; Systematically analyze the status of water ecological environment, propose a list of problems and causes, develop a target indicator system that coordinates water resources, water ecology, and water environment, taking into account necessity and accessibility, scientifically determine goals, and design a planning task and measure system that supports the achievement of goals based on problem orientation and goal orientation.
Complete the key points of urban water ecological environment protection. Extract a list of prominent problems and their causes at the municipal level, clarify the priority order for solving each problem, and propose corresponding task measures based on the water resources, water ecology, and water environment goals and requirements determined by each city. Form a list of "problems, causes, tasks, and projects" at the municipal level, and preliminarily complete the key points of municipal water ecological environment protection.
（3） Planning and Preparation Stage (May 2020 August 2020)
Based on the results of the special research and the key points of water ecological environment protection in various cities, and on the basis of the planning goals, tasks, and measures formulated by various departments directly under the provincial government and various cities, a preliminary indicator system and task measures for water ecological environment protection in the province's river basins have been determined, and a provincial-level river basin plan (draft for soliciting opinions) has been prepared.
（4） Revision and improvement stage (August 2020 December 2020)
Connect with relevant departments' special plans throughout the province, complete the solicitation of opinions on the 'River Basin Plan', and form a draft of the 'River Basin Plan' for submission.
Attachment: 1. Outline of the 14th Five Year Plan for the Protection of Water Ecological Environment in Key River Basins in Liaoning Province
2. Technical outline for the preparation of the 14th Five Year Plan for the protection of water ecological environment in key river basins (download email:) lnsgh145@163.com , Password: sc610610)
Attachment 1
Outline of the 14th Five Year Plan for the Protection of Water Ecological Environment in Key River Basins in Liaoning Province

According to the Technical Outline for the Compilation of the 14th Five Year Plan for the Protection of Water Ecological Environment in Key River Basins (Environmental Office Water Letter [2019] No. 937), the Leading Group for the Compilation of the 14th Five Year Plan for the Protection of Ecological Environment in Key River Basins and Sea Areas in Liaoning Province has formulated the outline for the compilation of the plan.
Chapter 1 Water Ecological Environment Status of River Basin
Including the construction of watershed zoning system, including watershed scope, natural overview, socio-economic status, control unit division, water environment quality status, ecological flow status, water ecological status, water pollutant discharge status, implementation effectiveness and experience of water ecological environment protection during the 13th Five Year Plan period, analysis of problems and causes, water ecological environment situation, etc.
（1） Overview of the watershed
（2） Water environment quality status
（3） Ecological flow status
（4） Water ecological status
（5） Discharge status of water pollutants
（6） The Implementation Effectiveness and Experience of Water Ecological Environment Protection in the 13th Five Year Plan
（7） Problem and Cause Analysis
（8） Water ecological environment situation
(Responsible departments: Provincial Department of Ecology and Environment, Provincial Department of Housing and Urban Rural Development, Provincial Department of Water Resources, Provincial Department of Agriculture and Rural Affairs, Provincial Forestry and Grassland Bureau and other relevant units shall divide their responsibilities according to their respective duties, with the cooperation of each municipal government. The following all require the cooperation of each municipal government and will not be listed.)
Chapter 2 General Requirements
Including guiding ideology, basic principles, water ecological environment protection ideas that reflect the characteristics of the watershed, planning objectives, and other contents.
（1） Guiding ideology
（2） Basic principles
（3） Protective mindset
（4） Planning objectives
Based on the principles of monitoring, statistics, and assessment, reflecting the combination of constraints and guidance, and in accordance with the requirements of "rivers, water, fish, grass, and harmonious human water", a planning index system is established to coordinate water resources, water ecology, and water environment. The stage target values are reasonably determined by basin, region, and year to ensure the implementation of the goals, striving for continuous improvement of water environment quality during the 14th Five Year Plan period, initial restoration of water ecosystem functions, and the basic formation of a coordinated promotion pattern for water resources, water ecology, and water environment.
Table 1: Conventional Indicators for the 14th Five Year Plan
category
Serial number
index
Responsible department
water environment
one
Proportion of excellent surface water (reaching or better than Class III) (%)
Relevant units such as the Provincial Department of Natural Resources, the Provincial Department of Ecology and Environment, the Provincial Department of Water Resources, the Provincial Department of Agriculture and Rural Affairs, and the Provincial Forestry and Grassland Bureau shall divide their responsibilities according to their respective duties

two
Proportion of surface water classified as Class V (%)


three
Water functional zone compliance rate (%)


four
Proportion of urban centralized drinking water sources reaching or exceeding Class III (%)

water resource
five
Number of rivers and lakes that meet the bottom line requirements for ecological flow (water level)

Water ecology
six
Aquatic organism integrity index


seven
Restoration length of river and lake ecological buffer zone (km)


eight
Wetland restoration (construction) area (km2)


Table 2: People friendly indicators for the 14th Five Year Plan
category
Serial number
index
Responsible department
water environment
one
Control proportion of black and odorous water bodies in urban built-up areas (%)
Relevant units such as the Provincial Department of Ecology and Environment, the Provincial Department of Housing and Urban Rural Development, the Provincial Department of Water Resources, and the Provincial Department of Agriculture and Rural Affairs shall divide their responsibilities accordingly
water resource
two
Number of rivers with water restored (units)

Water ecology
three
Number of water bodies reproducing indigenous fish or aquatic plants (units)


Chapter 3 Planning Task Requirements
Propose basic planning tasks from the aspects of pollution reduction, water resource security, water ecological protection and restoration, and risk prevention.
（1） Pollution reduction task
1. Implement investigation and rectification of river discharge outlets
2. Continuously promote industrial pollution prevention and control
3. Comprehensive improvement of urban pollution control
4. Strengthen the prevention and control of agricultural and rural pollution
5. Strengthen the prevention and control of mobile source pollution
（2） Water resource security
1. Transform high water consumption methods
2. Regulating and dispatching gates, dams, and reservoirs
3. Improve the regional recycled water recycling system
（3） Water ecological protection and restoration
1. Wetland restoration and construction
2. Ecological restoration of rivers and lakes
3. Restoration of aquatic organism integrity
（4） Risk prevention
1. Prevention and control of sudden risks
2. Cumulative risk prevention and control
(Responsible departments: Provincial Development and Reform Commission, Provincial Department of Industry and Information Technology, Provincial Department of Natural Resources, Provincial Department of Ecology and Environment, Provincial Department of Housing and Urban Rural Development, Provincial Department of Transportation, Provincial Department of Water Resources, Provincial Department of Agriculture and Rural Affairs, Provincial Forestry and Grassland Bureau and other relevant units shall divide their responsibilities according to their respective duties)
Chapter 4 Key Points for Water Ecological Environment Protection in Cities and Regions
（1） Focus on rivers
In addition to the 28 tributary rivers that require key treatment as stipulated in the Overall Work Plan for Comprehensive Management of the Liaohe River Basin (Department Secretariat [2019] No. 18), each city should also prepare water ecological environment protection points for other tributary rivers that are about to be included in the "14th Five Year Plan" surface water quality assessment, including but not limited to Laoha River, Liuhe River, Raoyang River, Xiaoliu River, Xinkai River, Xiushui River, Yangximu River, Dongsha River, Erdao River, Xihe (Benxi), Yangliu River, Erqianniu River, Caohe River, Aihe River, Fuerjiang River, Banla River, Fudu River, Gouhe River, Huli River, etc.
（2） List of Municipal Water Ecological Environment Protection
Based on the analysis of water ecological environment problems and causes in the control unit, prominent problems and causes are extracted at the municipal level, and the priority order for solving each problem is clarified. Combined with the requirements of water resources, water ecology, and water environment goals in various cities, corresponding task measures are proposed to form a list of "problems, causes, tasks, and projects" in the city.
Table 3 List of Water Ecological Environment Protection in Cities and Regions
Local City
control unit 
present situation
problem
origin
target
Task and Task Quantity
plan
project
**City
**Control unit
Water environment:
one
two
three
…………
one
two
…………
Water environment:




Water ecology:


Water ecology:




Water resources:


Water resources:



**Control unit
Water environment:
one
two
three
…………
one
two
…………
Water environment:




Water ecology:


Water ecology:




Water resources:


Water resources:



…………







(Led by the Provincial Department of Ecology and Environment, with cooperation from relevant departments and bureaus)
Chapter 5 Backbone Engineering Projects and Investment
Statistically plan the number and investment scale of backbone engineering projects according to control units, project types, etc.
(Led by the Provincial Department of Ecology and Environment, with cooperation from relevant departments and bureaus)
Chapter 6 Guarantee Measures
Propose policy measures to ensure the implementation of the plan.
(Led by the Provincial Department of Ecology and Environment, with cooperation from relevant departments and bureaus)
National Marine Ecological Environment Protection 14th Five Year Plan and Liaoning Province Marine Ecological Environment Protection 14th Five Year Plan Compilation Work Plan

In order to implement the requirements of laws and regulations such as the Environmental Protection Law of the People's Republic of China and the Marine Environment Protection Law of the People's Republic of China, and to implement the deployment of the Ministry of Ecology and Environment in the preparation and pilot work of the "14th Five Year Plan for National Marine Ecological Environment Protection" (hereinafter referred to as the "National Plan"), based on the "14th Five Year Plan for National Marine Ecological Environment Protection Planning Preparation Work Plan" and combined with the actual work of Liaoning Province's marine ecological environment protection planning preparation, this plan is formulated.
1、 Overall objectives and requirements
（1） Work objectives
1. Carry out pilot projects in Jinzhou. The Jinzhou Municipal Government organized the implementation of the "14th Five Year Plan" for national marine ecological environment protection pilot work in Jinzhou, formulated work plans, research plans, and other work results, and took the lead in issuing and implementing the "14th Five Year Plan" for marine ecological environment protection in Jinzhou City (hereinafter referred to as the "pilot plan"). Through pilot projects, accumulating experience, demonstrating and driving, guidance will be provided for the comprehensive completion of the "14th Five Year Plan" for marine ecological environment protection planning in China, Liaoning Province, and coastal cities.
2. Prepare work plans and research reports. Coastal cities are preparing the "14th Five Year Plan for National Marine Ecological Environment Protection" and the "14th Five Year Plan for Coastal City level Marine Ecological Environment Protection", as well as the "Research Report on Prominent Issues in Coastal City level (Key Bays and Estuaries) Marine Ecological Environment"; Provincial level compilation of the "14th Five Year Plan for National Marine Ecological Environment Protection and the Work Plan for Liaoning Province's Marine Ecological Environment Protection" 14th Five Year Plan "and the" Research Report on the Situation and Tasks of Liaoning Province's Marine Ecological Environment Protection ".
3. Issuing provincial and municipal level plans. At the same time as completing the national planning results, provinces and cities have formulated and issued the "14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province" (hereinafter referred to as the "Provincial Plan") and the "14th Five Year Plan for Coastal City level Marine Ecological Environment Protection" (hereinafter referred to as the "Municipal Plan").
（2） Overall requirements
1. Synchronized promotion. The "Provincial Plan" and "Municipal Plan" should be basically synchronized with the time nodes of the "National Plan", and coastal cities should actively participate in the entire planning process of the Jinzhou pilot project, such as research and discussions, to provide guidance for the preparation of the "Municipal Plan".
2. Strict technical review. According to the national plan requirements, the Provincial Department of Ecology and Environment, together with the National Marine Environment Monitoring Center, will conduct technical reviews of the planning results of coastal cities. The Beihai Branch of the Haihe River Basin Bureau of the Ministry of Ecology and Environment, in conjunction with the National Marine Environment Monitoring Center, reviews and controls the results of provincial-level planning.
3. Collaborative promotion among member units. Provincial and coastal city governments provide the necessary materials for national planning preparation according to their functions, propose industry planning objectives, and collaborate to complete the national, provincial, and municipal planning work, ensuring that the marine ecological environment protection plan is fully integrated with various industry plans.
（3） Scope and timeline of planning
The planning scope covers the sea areas under the jurisdiction of Liaoning Province (consistent with the boundaries of national spatial planning).
The planning deadline is from 2021 to 2025, with 2020 as the baseline period.
2、 Principles of Compilation
1. Land sea coordination. Deepen the idea of "connecting land and sea" and "connecting land and sea pollution prevention and ecological protection", strengthen the overall planning and organic connection between land and sea, combine the supervision of major rivers and sewage outlets, coordinate the prevention and control of pollution in land and sea areas, and accelerate the construction of a coordinated ecological environment governance system from land to sea.
2. Problem oriented approach. Based on a comprehensive summary of the problems and experiences in the 13th Five Year Plan, guided by the prominent marine ecological environment problems in Liaoning Province, with the goal of solving these problems, a feasible and executable action plan will be formulated, and scientific and reasonable planning tasks will be determined.
3. Focus on people's livelihood. Focus on promoting the resolution of marine ecological environment protection issues related to people's livelihood and high social attention, effectively solving marine ecological environment problems around the people, and enhancing the sense of happiness, gain, and security of the public.
4. The goal is achievable. With the goal of improving the quality of marine environment and restoring typical ecosystems, guided by solving practical problems, and combined with the actual situation of social and economic development in Liaoning Province, we propose economically feasible, assessable, and evaluable "14th Five Year Plan" stage target indicators to ensure the smooth achievement of the stage goals of marine ecological environment protection in Liaoning Province and coastal cities during the 14th Five Year Plan period.
　3、 Organizational implementation and division of responsibilities
The 14th Five Year Plan for Marine Ecological Environment Protection is a comprehensive plan that involves various functional departments and coastal cities. The provincial government and coastal city governments serve as the main body of planning preparation, and in accordance with the requirements of the National Planning Work Plan, they clarify the leading department, establish a coordination mechanism, and jointly promote the timely completion of planning work. The North Sea Branch of the Watershed and Sea Area Supervision Bureau of the Ministry of Ecology and Environment is responsible for comprehensive coordination, scheduling, guidance, and participation in major discussions and research on the "Provincial Plan" for sea areas.
（1） Provincial level
1. Organizational structure
Establish a leading group for the formulation of the "14th Five Year Plan" for ecological environment protection in key river basins and marine areas in Liaoning Province. The Department of Ecology and Environment, as the leading department, is responsible for coordinating, scheduling, and promoting the preparation of plans at all levels. It also collaborates with relevant departments such as the Provincial Development and Reform Commission, the Department of Finance, the Department of Natural Resources, the Department of Housing and Urban Rural Development, the Department of Transportation, the Department of Agriculture and Rural Affairs, the Academy of Agricultural Sciences, the Forestry and Grassland Bureau, and the Liaoning Maritime Bureau to organize and carry out the preparation of the "Plan". The leadership group consists of an office, a technical support group, and a planning expert group. The office is specifically responsible for national, provincial, and municipal communication and coordination, organizing and coordinating research, discussions, and other work. The technical support team is specifically responsible for drafting and compiling relevant technical support work for planning. The expert group is responsible for overseeing the planning framework and content throughout the entire process. Provincial member units and relevant departments of coastal cities jointly participate.
2. Division of responsibilities among provincial departments
Responsible for proposing the "14th Five Year Plan" marine ecological environment protection goals and indicators for the industry, sorting out prominent problems in the marine ecological environment, analyzing the reasons, proposing solutions, researching and proposing a list of marine ecological environment protection projects during the planning period, guiding the preparation of "municipal level plans" for coastal cities, and cooperating with "national planning" research and thematic studies.
3. Technical support units and responsibilities
The technical support for the preparation of the "14th Five Year Plan" for marine ecological environment protection in Liaoning Province is undertaken by the Liaoning Provincial Ecological Environment Science and Technology Center, mainly responsible for drafting the technical outline and research report for planning preparation, organizing research and related technical review work, and preparing the "Provincial Plan" (draft for review).
（2） At the municipal level
1. Organizational structure and responsibilities
(1) Referring to the leading group for the preparation of the provincial plan, establish a corresponding leading group for the preparation of the city level plan, organize the preparation of the city level plan, and ensure funding support.
(2) Summarize and analyze the effectiveness and shortcomings of marine ecological environment protection during the 13th Five Year Plan period, analyze the shortcomings and causes of marine regulatory capabilities, summarize and analyze the prominent problems and causes of marine ecological environment protection, and make a detailed list from bottom to top.
(3) Each functional department shall jointly organize and carry out planning work, coordinate with relevant industry plans, propose the "14th Five Year Plan" marine ecological environment protection goals for various related industries, sort out existing problems, propose solutions, and study and propose a list of major marine ecological environment protection projects during the planning period.
2. Technical support units
The technical support unit for the preparation of the Municipal Planning shall be determined by the people's governments of each city according to the actual situation, mainly responsible for the research, drafting, and preparation of other achievements of the Municipal Planning.
（3） Jinzhou Pilot Work
The pilot work of Jinzhou in the national marine ecological environment protection "14th Five Year Plan" is being promoted under the unified deployment and guidance of the Ministry of Ecology and Environment and the North Sea Branch of the River Basin and Sea Area Supervision Bureau.
1. Organizational structure and responsibilities
(1) The North Sea Branch of the Watershed and Sea Area Supervision Bureau of the Ministry of Ecology and Environment is responsible for comprehensive coordination and scheduling of sea areas, and deploying work tasks; Organize technical review. The National Marine Environment Monitoring Center is responsible for technical assistance.
(2) The Provincial Department of Ecology and Environment is responsible for communication and coordination among the national, provincial, and municipal levels, coordinating the preparation of pilot plans, guiding research, discussions, and other work, reviewing and submitting the results of pilot work.
(3) The People's Government of Jinzhou City is the main responsible party for planning and formulation, and has established an organizational structure to ensure financial support. Responsible for organizing the preparation of work plans, research plans, and implementing planning work, submitting work results on schedule, and issuing and implementing the "14th Five Year Plan for Marine Ecological Environment Protection in Jinzhou City".
2. Technical support units
The National Marine Environment Monitoring Center is a technical assistance unit that provides technical support for the preparation of the Pilot Plan. The specific work is arranged by the Jinzhou Municipal Government.
4、 Schedule and timeline
（1） Preparation of Jinzhou Pilot Plan
1. Start up phase (December 2019 March 2020)
(1) Initiate the pilot work of Jinzhou Marine Ecological Environment Protection Plan, formulate the "National Marine Ecological Environment Protection 14th Five Year Plan Jinzhou Pilot Work Plan (Draft)" and "Technical Outline (Draft)", submit them to the Provincial Department of Ecology and Environment for review, and then report to the North Sea Branch of the Watershed and Sea Area Supervision Bureau of the Ministry of Ecology and Environment.
(2) Establish a city level coordination mechanism for the joint preparation of plans by relevant departments involved in maritime affairs, and assign personnel from each department to serve as liaison officers for the preparation of the plan.
2. Research stage (March 1st to May 31st, 2020)
(1) Formulate the "Pilot Work Plan for Jinzhou City in the 14th Five Year Plan for National Marine Ecological Environment Protection", "Technical Outline" and "Research Outline", and submit them to the Provincial Department of Ecology and Environment for review and then to the Marine Ecological Environment Department of the Ministry of Ecology and Environment.
(2) Through data collection, combined with the main achievements and experiences obtained during the 13th Five Year Plan period, a research plan for analyzing prominent issues in the marine ecological environment has been determined, and a preliminary analysis report on the basic situation and problems of the marine ecological environment in Jinzhou City has been completed.
(3) According to the research plan, the research work will be conducted through discussions and on-site inspections. Further identify prominent issues and their causes in the marine ecological environment, assess the situation, grasp the next steps for marine functional departments, and complete the "Research Report on Prominent Issues in the Marine Ecological Environment of Jinzhou City".
3. Planning drafting stage (April 15th to early June 2020)
On the basis of completing preliminary research, determine the outline for planning, organize the drafting of the plan, and form the text of the "Plan (Draft for Soliciting Opinions)".
4. Soliciting opinions, revising signatures, and submitting for approval stage (end of June 2020)
(1) Solicit opinions from society and relevant departments, conduct thorough discussions, and organize national and provincial ecological environment departments and relevant experts to complete technical reviews.
(2) Revise and improve the relevant content according to expert review opinions, form the "Plan (Draft for Approval)", and submit it to the Ministry of Ecology and Environment through the Provincial Department of Ecology and Environment.
（2） Compilation of Provincial Planning and Coastal City Planning
1. Start up phase (October 2019 April 2020)
(1) Establish a leading group for the preparation of the "14th Five Year Plan" for ecological environment protection in key river basins and marine areas in Liaoning Province, establish a coordination mechanism for the joint preparation of plans by relevant departments and coastal cities, and clarify the members and liaison officers of the leading group for the preparation of plans by various departments and coastal cities.
(2) Analyze the implementation of the "Action Plan for Water Pollution Prevention and Control", "Action Plan for Comprehensive Governance of Bohai Sea", "13th Five Year Plan for Marine Environmental Protection in Liaoning Province", etc., summarize experience, analyze prominent problems, analyze the situation of marine ecological environment in the "14th Five Year Plan", take problems as guidance, and form a framework for the "14th Five Year Plan".
(3) To implement the guiding ideology of the Party Central Committee and the State Council on the construction of marine ecological civilization, we have formulated and issued the "14th Five Year Plan for National Marine Ecological Environment Protection and the Work Plan for the Compilation of Liaoning Province's Marine Ecological Environment Protection 14th Five Year Plan" and the "Technical Outline for the Compilation of Liaoning Province's Marine Ecological Environment Protection 14th Five Year Plan".
(4) Convene meetings for planning and development of provincial units and coastal cities, deploy tasks for the preparation of provincial and municipal plans, and conduct technical training for the preparation of provincial plans.
2. Investigation and research stage (April 2020 August 2020)
(1) Coastal cities and member units of the Provincial Planning shall submit relevant materials in accordance with the requirements of the technical outline.
(2) On the basis of the pilot work, special research will be organized and conducted through discussions and on-site inspections. Materials will be submitted according to the technical outline requirements, and relevant supporting materials and data information will be compiled and summarized.
(3) On the basis of sufficient research, coastal cities have completed the "Research Report on Outstanding Issues of Marine Ecological Environment in Key Bays and Estuaries", and provincial-level cities have completed the "Research Report on the Situation and Tasks of Marine Ecological Environment Protection in Liaoning Province during the 14th Five Year Plan", laying a solid foundation for planning and formulation.
3. Planning and Preparation Stage (September 2020 December 2020)
(1) On the basis of research, coastal cities have compiled the text of "City level Planning (Preliminary Draft)".
(2) On the basis of sufficient research, connect with industry plans such as national land and space, and prepare the "Provincial Plan (Preliminary Draft)" text.
(3) Organize the completion of expert consultation and review, and submit it to the special meeting of the director for review according to the procedures. Each city shall submit it to the special meeting of the director for review.
4. Soliciting opinions, revising and signing stage (January 2021 May 2021)
On the basis of summarizing data and conducting sufficient research in the early stage, combined with the research on the situation and tasks of marine ecological environment protection and the prominent problems of marine ecological environment in key bays and estuaries, the "Provincial Plan (Draft for Solicitation of Opinions)" text was formed, and opinions from various cities and departments were solicited for further modification and improvement, forming the "Provincial Plan (Draft for Approval)", which will be implemented in accordance with the "Municipal Plan".
5. Approval stage (June 2021)
The "Provincial Plan" shall be submitted to the provincial government for approval and implemented after the issuance of the "14th Five Year Plan for National Marine Ecological Environment Protection". The "City level Plan (Draft for Approval)" is approved by the governments of coastal cities and will be implemented after the issuance of the "National Plan" and "Provincial Plan".
Technical Outline for the Compilation of the 14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province
Catalog

1、 Overview
（1） Compilation basis
（2） Planning scope and timeline
（3） Compilation ideas
（4） Principles of Compilation
（5） Develop technical roadmap
2、 Main job tasks
（1） Summarize the effectiveness and experience
（2） Identify prominent issues
（3） Set target indicators
（4） Implement planning tasks
（5） Filter planning projects
（6） Develop policy measures
3、 Work achievement requirements
Attachment 1
Attachment 2
According to the requirements of the "Letter on Issuing the Technical Outline of the National Marine Ecological Environment Protection Plan for the 14th Five Year Plan" (Ocean Letter [2020] No. 4), the Liaoning Provincial Marine Ecological Environment Protection Planning Leading Group for the 14th Five Year Plan has formulated the "Technical Outline for the Compilation of the 14th Five Year Marine Ecological Environment Protection Plan" (hereinafter referred to as the "Plan") to guide the compilation of the "Plan" in Liaoning Province and coastal cities.
1、 Overview
（1） Compilation basis
1. Xi Jinping Thought on Ecological Civilization
 
3. Laws and regulations
Environmental Protection Law of the People's Republic of China
Marine Environmental Protection Law of the People's Republic of China
4. Policy documents
Overall Plan for Ecological Civilization System Reform
Opinions of the Central Committee of the Communist Party of China and the State Council on Strengthening Ecological Environment Protection and Resolutely Fighting the Battle of Pollution Prevention and Control
Action Plan for Water Pollution Prevention and Control
Pollution Prevention and Control Plan for Coastal Waters
Action Plan for Comprehensive Governance of Bohai Sea
Several Opinions on Accelerating the Green Development of Aquaculture Industry
5. Local regulations and policy documents
（2） Planning scope and timeline
The planning scope covers the sea areas under the jurisdiction of Liaoning Province.
The planning deadline is from 2021 to 2025, with 2020 as the baseline period.
（3） Compilation ideas
  Under the guidance of the "14th Five Year Plan for National Ecological Environment Protection" and the "14th Five Year Plan for National Marine Ecological Environment Protection", with improving the quality of marine ecological environment as the core, and in accordance with the overall requirements of "connecting land and sea pollution prevention and ecological protection", top-level design and comprehensive system planning will be carried out for marine ecological environment protection work in the future period, and deployment arrangements will be made for the goals and tasks of marine ecological environment protection in Liaoning Province during the "14th Five Year Plan". The phased tasks of marine ecological environment protection in Liaoning Province during the "14th Five Year Plan" will be completed with high quality.
（4） Principles of Compilation
1. Land sea coordination. Deepen the idea of "connecting land and sea" and "connecting land and sea pollution prevention and ecological protection", strengthen the overall planning and organic connection between land and sea, combine the supervision of major rivers and sewage outlets, coordinate the prevention and control of pollution in land and sea areas, and accelerate the construction of a coordinated ecological environment governance system from land to sea.
2. Problem oriented approach. Based on a comprehensive summary of the problems and experiences in the 13th Five Year Plan, guided by the prominent marine ecological environment problems in Liaoning Province, with the goal of solving these problems, a feasible and executable action plan will be formulated, and scientific and reasonable planning tasks will be determined.
3. Focus on people's livelihood. We will focus on addressing marine ecological and environmental issues that are of high concern to people's livelihoods and society, pay attention to solving problems around the people, and enhance the public's sense of happiness, gain, and security.
4. The goal is achievable. With the goal of improving the quality of marine environment and restoring typical ecosystems, with the core of enhancing public sense of gain, and guided by solving practical problems, combined with the actual situation of social and economic development in Liaoning Province, economically feasible, assessable, and assessable "14th Five Year Plan" stage target indicators are proposed to ensure the smooth realization of the stage goals of marine ecological environment protection in Liaoning Province and coastal cities during the 14th Five Year Plan period.
（5） Develop technical roadmap
According to the "Work Plan", the process for preparing the "Plan" is as follows: based on the pilot work in Jinzhou, the provincial and coastal city levels will work together to implement task arrangements step by step from top to bottom. From bottom to top, the tasks will be summarized step by step in the order of the "Research Report on Key Marine Ecological Environment Issues in Coastal Cities' Key Bays and Estuaries" and the "Research Report on the Situation and Tasks of Marine Ecological Environment Protection in Liaoning Province's 14th Five Year Plan", ensuring that problem diagnosis and analysis at all levels are connected and coordinated with the target tasks. The technical roadmap for the preparation of the "Plan" is shown in Figure 1, which mainly includes:
1. Conduct a comprehensive analysis of the basic characteristics and challenges of the marine ecological environment in major bay areas (bays, estuaries, etc.) and coastal cities in our province, and summarize the achievements in marine ecological environment protection during the 13th Five Year Plan period, as well as the replicable and promotable experience models formed by the comprehensive management of the Bohai Sea and the prevention and control of pollution in coastal waters.
2. The system organizes basic data, identifies prominent problems in key sea areas, analyzes the crux of the problems, and clarifies key control units.
3. Coordinate and connect with the "14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province", "14th Five Year Plan for Key Watershed Water Ecological Environment Protection", as well as relevant plans such as national spatial planning, overall planning for the protection and restoration of important ecosystems in Liaoning Province, etc. Based on problem orientation and goal orientation, taking management and good use as the starting point, and following the ideas and requirements of bottom-up, land sea coordination, and regional linkage, research and propose the guiding ideology, basic principles, overall ideas, and strategic deployment for marine ecological environment protection in the 14th Five Year Plan.
4. Clarify the target indicators, main task deployment, major projects, and measures list of the 14th Five Year Plan, and develop targeted and differentiated control measures and guarantee measures.
　　

Figure 1: Technical Roadmap for Preparing the Plan
2、 Main job tasks
（1） Summarize the effectiveness and experience
Summarize and analyze the basic characteristics of regional marine ecological environment, systematically evaluate the achievements and shortcomings of various functional departments at the provincial level and coastal cities in marine ecological environment protection during the 13th Five Year Plan period, including the completion of target indicators, progress of main tasks, achievements and experiences in the "Water Pollution Prevention and Control Action Plan", "Coastal Area Pollution Prevention and Control Plan", and "National Marine Ecological Environment Protection Plan (2017-2020)". Focus on evaluating the implementation of the Action Plan for the Comprehensive Governance of Bohai Sea, summarizing the problems, achievements, and replicable and promotable experience models formed in the implementation of the comprehensive governance of Bohai Sea.
（2） Identify prominent issues
Guided by practical solutions to actual problems, with major bays and estuaries as basic units, accurately identify the main problems and crux of the problem. To highlight key areas, focus on national key maritime development strategic zones, key fields, key industries, etc., conduct in-depth research on prominent marine ecological environment issues in nearshore waters, comprehensively understand the situation, existing problems, root causes of problems, and the policy measures, implementation approaches, and supported engineering projects needed to solve these problems, and clarify the list of problems that need to be solved and can be solved in the near future.
1. Marine ecological environment status
(1) Changes in environmental quality
Analyze the overall status and changing trends of marine environmental quality in coastal cities, key bays, and major river mouths, as well as the spatiotemporal characteristics of major pollution indicators, eutrophication status, and water quality standards. Fully grasp the distribution and discharge situation of major rivers entering the sea and sewage outlets, and identify the main sources of pollutants and types of polluting industries. Among them, water quality, eutrophication, and major pollution indicators in marine environmental quality data are obtained by analyzing monitoring data from national and local environmental and marine departments over the years; The discharge situation of rivers and sewage outlets into the sea is obtained through monitoring data from national and local environmental and marine departments.
(2) Typical ecosystem conditions
Analyze the historical changes and spatial distribution of typical ecosystems such as important coastal wetlands in various coastal cities, as well as various levels and types of marine protected areas and natural shorelines. Analyze the increase and decrease of rare and endangered marine species in different regions, the distribution of "three fields and one channel", and the changes in marine biodiversity and natural fishery resources in recent years. The typical state of marine ecosystems is mainly obtained through various methods such as multi period remote sensing interpretation, on-site investigation, monitoring data, and historical information.
(3) Analysis of Disaster Risk and Sudden Accidents
Investigate the types and distribution of coastal enterprises, as well as the situation of mobile risk sources such as offshore drilling platforms and ships. Analyze the types, distribution areas, and economic losses of marine ecological disasters and sudden environmental events in various regions over the years, analyze the causes, identify key environmental risk sources, high-risk areas, and key regulatory targets. Marine ecological disasters can obtain relevant monitoring and remote sensing interpretation data through departments such as ocean, environment, and resources. The data on sudden accidents is mainly obtained from local maritime bureaus, maritime search and rescue centers, and other departments.
Organize relevant data on marine environmental quality, biological ecology, disaster risk, socio-economic development, etc. (2015-2019). Regions with conditions can trace back a longer period of time, and data available in 2020 should also be updated in a timely manner. Coastal cities are responsible for organizing relevant supporting materials and data, and submitting them to provincial technical support units for summary and review.
2. List of Marine Ecological Environment Issues
Based on the evaluation results of marine environmental quality over the years, the status of marine ecosystems, marine biological resources, and the occurrence of ecological disasters and emergencies, combined with actual investigations, the current marine ecological environment is mainly characterized by serious pollution in bays and estuaries, destruction of typical marine ecosystems, rapid decline of marine biological resources, frequent occurrence of ecological disasters and emergencies, and difficulty for the public to access the sea. Common problems and their causes are detailed in Table 1.
(1) Serious pollution at the mouth of the bay
The current problems in the marine environment include severe pollution at the mouth of bays and estuaries, including a decline in seawater quality, eutrophication, and the detection of toxic and harmful new pollutants.
(2) Typical marine ecosystems have been damaged
Carry out actual research to sort out the main ecological problems caused by the destruction of typical marine ecosystems, including but not limited to the reduction of natural shoreline retention rate, large area occupation of mudflat and wetlands, random changes in the scope of the reserve, and insufficient ecological water demand.
(3) Decline of marine biological resources
Based on the analysis of the status of marine biological resources and practical research, the main problems in the current decline of marine biological resources are summarized, which are manifested as the reduction of endemic species in the sea area, the decline of biodiversity, the obstruction of fish migration, the destruction of spawning grounds, nursery grounds, wintering grounds, and feeding grounds, and the decline of high-quality fishery resources.
(4) Frequent occurrence of ecological disasters and emergencies
Based on the analysis of ecological disasters and emergencies, combined with actual research, we have sorted out the current problems of frequent marine ecological disasters and environmental emergencies, including jellyfish outbreaks, frequent red tides, green tides, brown tides, invasive alien species and other ecological disasters, as well as oil spills, hazardous chemical spills and other emergencies.
(5) Public access to the sea is difficult to access
From the perspective of the public's affinity for the sea, combined with practical research, this article summarizes the current problems of public facing difficulties in accessing the sea, including land reclamation, structural barriers leading to public facing difficulties in accessing the sea, and poor overall environmental quality in public facing areas such as seaside resorts and coastal tourism resorts.
Coastal cities are responsible for diagnosing and identifying prominent marine ecological and environmental issues within their administrative regions, sorting out lists of key bay and river mouth problems, and city problem lists. They should clarify the spatial distribution areas and changing trends of various problems, and prioritize problem-solving; Analyze the specific causes of the above problems from the aspects of pollution emissions, human destruction, excessive development and utilization, and supervision and management. Provincial departments identify and sort out the list of marine ecological environment protection issues in Liaoning Province from an industry perspective.
Table 1 Reference List of Marine Ecological Environment Issues
type
problem
reason
Serious pollution at the mouth of the bay
The seawater quality is consistently poor, with a decrease in grade and severe eutrophication

Through river transport, atmospheric deposition, and seawater aquaculture, a large amount of nutrients enter the ocean, causing extensive damage to estuarine wetlands and seagrass (algae) beds, and a decrease in self purification capacity, resulting in severe exceedance of nitrogen and phosphorus nutrients in seawater.
Toxic and harmful new pollutants detected
The content of new pollutants such as antibiotics, microplastics, and persistent organic pollutants has increased
Typical marine ecosystems have been damaged
There are arbitrary changes to the scope of the protected area

The marine ecological protection system and spatial pattern are not sound, and the daily supervision of various marine protected areas is insufficient
The retention rate of natural shorelines has decreased

Reclamation of land, construction of ports and dams, etc
The mudflat wetland is occupied in a large area

Sea reclamation (planting), land reclamation, etc
Degradation of seagrass beds

Human destruction, land reclamation, lack of management, etc
Insufficient ecological water demand
Upstream dam construction, insufficient inflow into the sea, etc
Decline of marine biological resources
Decreased biodiversity

Overfishing, habitat loss, seawater pollution, etc
The reduction of endemic species in the sea area

Overfishing, habitat loss, seawater pollution, etc
Decline of high-quality fishery resources

Overfishing, illegal fishing, trawling, etc
Fish migration is obstructed

Human activities, marine engineering construction, illegal fishing, etc
Degradation of spawning grounds, nursery grounds, wintering grounds, and feeding grounds
Sea water pollution, reclamation, loss of habitat, reduction of ecological water use, obstruction of channels, etc
Frequent occurrence of ecological disasters and emergencies
Frequent occurrence of red tide, green tide, brown tide, and jellyfish blooms

Eutrophication of water bodies, overfishing, etc
Invasive alien species

Inappropriate introduction and management of alien species
High risk of oil spill

Outdated and poorly managed facilities such as oil pipelines, oil leaks from pipelines and oil drilling platforms, ship accidents, discharge of oily wastewater from ships, and oil spills from coastal petrochemical plants and storage facilities into the sea
Chemical leakage
Leakage during the loading, unloading, and transportation of hazardous chemicals, as well as explosions and leaks from coastal chemical plants and storage facilities into the sea
Public access to the sea is difficult to access
Encirclement and reclamation, as well as structural barriers, make it difficult for the public to access the sea

The reclamation of land has led to a decrease in public sea friendly space; Structural barriers make it difficult for the public to have access to the sea
The comprehensive quality of the environment, such as seaside resorts and coastal tourist resorts, is poor
（3） Set target indicators
Fully considering the goal of "providing more high-quality ecological products to meet the growing needs of the people for a beautiful ecological environment" and enhancing the happiness and sense of achievement of the people during the 14th Five Year Plan period, based on the overall improvement of marine ecological environment quality, we aim to achieve sustained and stable improvement of marine ecological environment quality, fundamentally curb the trend of marine ecological degradation, and gradually improve it. Add indicators that are closely related to the daily lives of ordinary people, such as the water quality of beaches. On the basis of clean oceans, we should move towards a healthy and harmonious ocean, allowing the public to enjoy clear seas, blue skies, and clean beaches. This will effectively improve the sense of achievement of ordinary people towards clear seas and blue bays, as well as their happiness towards the sea and its surroundings.
According to the principles of "quantifiability, evaluability, and assessment", further clarify the short-term and long-term goals and tasks of marine ecological environment protection and beautiful ocean construction, and develop indicators for marine ecological environment protection through a combination of "top-down" and "bottom-up" methods to ensure the scientific and rational nature of the goals. We strive to make significant improvements to the marine ecological environment in our province during the 14th Five Year Plan period, presenting a beautiful picture of blue sea and sky, silver beaches and green banks, abundant beautiful scenery, and harmonious human population to the people.
The goal setting of the 14th Five Year Plan should be aligned with the strategic goal of "fundamentally improving the ecological environment and achieving the basic goal of a beautiful China" by 2035, and lay a solid foundation for achieving "comprehensive improvement of ecological civilization, harmonious coexistence between humans and nature, and building a beautiful China" by the middle of this century. Fully considering the characteristics of the bay and the city, we need to take into account both the basic requirements and conventional indicators for marine ecological environment protection during the 14th Five Year Plan period (Table 2), as well as regional realities, and develop a differentiated and locally applicable characteristic target indicator system (Table 3).
Table 2 Conventional Indicators for Marine Ecological Environment Protection
category
Serial number
index
Company
Indicator category
marine environment
Quality improvement
one
Proportion of excellent water quality in nearshore waters and key bays
%
Constrained nature
Marine ecology
Protect and repair
two
Natural shoreline retention rate
%
Constrained nature

three
Length of shoreline restoration
Kilometers
Constrained nature

four
Restoration and restoration area of coastal wetlands
hectare
Constrained nature

Table 3 Characteristic Indicators of Marine Ecological Environment Protection Areas
category
Subclass
Serial number
index
marine environment
Quality improvement
Improvement of environmental quality in key areas
one
The degree of decline in eutrophication in major river mouths


two
Water quality compliance rate of beach
marine organism
Ecological protection
Ecological protection
three
Population size of key protected species

Habitat restoration and restoration
four
Restoration area of wetlands such as reeds


five
Area of retiring and returning to the beach

1. Conventional indicators
Proportion of excellent water quality in nearshore and key bays: The area of seawater quality that meets the first and second categories respectively accounts for the proportion of the area of nearshore waters and key bays under its jurisdiction.
Natural shoreline retention rate: the proportion of the length of the mainland's natural shoreline to the total shoreline length. According to the Notice on the Implementation of the Action Plan for Comprehensive Governance of Bohai Sea (Huan Haiyang [2019] No. 5), the natural coastline refers to the coastline formed by the interaction between land and sea, including sandy coastline, silty coastline, bedrock coastline, biological coastline and other native shorelines. The coastline with natural coastal morphology and ecological functions after rectification and restoration will be included in the management of natural coastline control objectives.
Shoreline restoration length: The length of the natural shoreline restored through remediation and restoration.
Restoration and restoration area of coastal wetlands: The area of restored coastal wetlands. According to the Notice of the State Council on Strengthening the Protection of Coastal Wetlands and Strictly Controlling Reclamation (GF [2018] No. 24), coastal wetlands include coastal mudflat, estuaries, etc.
2. Regional characteristic indicators
The degree of decline in eutrophication in major river mouths: the average degree of decline in eutrophication index in the river mouth area. The formula for calculating eutrophication index is E=[chemical oxygen demand] x [inorganic nitrogen] x [active phosphate] x 106/4500. E ≥ 1 indicates eutrophication, with 1 ≤ E ≤ 3 indicating mild eutrophication and 39 indicating severe eutrophication.
Water quality compliance rate of beach resorts: The proportion of beach resorts that meet the second category of sea water quality standards required by the "Sea Water Quality Standards (GB 3097-1997)" to the total number of beach resorts approved by the people's governments at or above the municipal level within the designated coastal scenic areas in the administrative region.
Population size of key protected species: The population size of key protected species in the region, namely national first and second level protected animals.
Restoration area of wetlands such as reeds: The area of wetlands such as mangroves, tamarisk forests, and reeds that have been restored.
The area of wetland restoration through retirement and beach restoration: the area of wetland restoration through retirement and beach restoration.
In addition, according to the actual work of regional marine ecological environment protection, various regions can also implement other key indicators that need to be treated and protected, such as the rectification of sea discharge outlets, the supervision and pollution control of aquaculture tailwater discharge, and the prevention and control of marine garbage pollution, into the target tasks of the local "Plan".
（4） Implement planning tasks
Based on planning ideas and principles, with the goal of improving the marine ecological environment as the core, fully considering the differences in natural environment, socio-economic, and population development in the sea areas, bays, and estuaries of our province and coastal cities, accurately identifying the main problems and crux of the problem, clarifying the marine ecological environment protection target indicators that reflect regional characteristics and industry differences, and scientifically and reasonably designing and planning key tasks with targeted measures.
Provincial functional departments and coastal cities, based on major bays and river mouths as basic units, carry out research on prominent issues of marine ecological environment, fully connecting with the special planning of the State Council and relevant departments in Liaoning Province. Through various forms such as on-site research, expert consultation, and data collection and analysis, they study and propose the requirements and countermeasures for the protection of marine ecological environment in their respective industries and administrative regions during the 14th Five Year Plan period. Coastal cities prepare the "Research Report on the Situation and Tasks of Marine Ecological Environment Protection in the 14th Five Year Plan Area" according to the outline requirements in Annex 2, and submit relevant supporting materials and data information.
（5） Filter planning projects
According to the planning objectives, combined with the needs of marine ecological environment governance, protection and restoration, and local characteristics, provincial functional departments and coastal cities propose detailed project lists and simplified project analysis reports from bottom to top, including the necessity of project implementation, construction scale and layout, construction content, project performance, implementation period, etc., and calculate the project task volume and investment demand. Prioritize the needs of marine ecological environment governance, project maturity, and other factors to develop a rolling list of projects. Provincial level is responsible for summarizing and forming a project database. The relevant engineering measures for the governance of marine ecological environment problems can refer to Table 4.
1. Selection principle
Problem oriented. The project design should be conducive to solving prominent marine ecological and environmental problems in the region, and play a positive role in improving marine environmental quality, protecting and restoring marine ecosystems, preventing marine ecological disasters and emergencies, and effectively realizing the ecological and environmental benefits of the project.
Scientifically feasible. The project design should fully consider factors such as the suitability of natural conditions, the applicability of key technologies, and the convenience of operation and management. It is necessary to coordinate the overall system of the bay estuary watershed, strengthen the feasibility study and environmental impact assessment of the project, and ensure the sustainability and comprehensive governance effect of the project.
Effective supervision. Following the principles of monitoring, statistics, and assessment, establish a complete set of operation and management mechanisms from project initiation, implementation, effectiveness evaluation to acceptance, focusing on clarifying the social, economic, and ecological benefits generated by water quality improvement and ecological restoration, such as reduction of characteristic pollutants, wetland restoration area, and shoreline restoration length.
2. Project type
According to the prominent marine ecological environment issues, improvement goals, protection requirements, and planning task measures, the planning projects are divided into types such as "Gulf and River Mouth Deterioration Action", "Important Habitat Protection and Restoration Action", "Risk Prevention and Emergency System Construction", and "Monitoring and Supervision Basic Capacity Construction", as shown in Table 5.
Table 4 Reference Toolbox for Governance of Marine Ecological Environment Issues
type
problem
reason
Legal regulations/institutional construction
Engineering measures
Serious pollution at the mouth of the bay
Severe eutrophication
Through river transport, atmospheric deposition, and seawater aquaculture, a large amount of nutrients enter the ocean, causing extensive damage to estuarine wetlands and seagrass (algae) beds, and a decrease in self purification capacity, resulting in severe nitrogen exceedance in seawater.
1. Implement a dual control system for water quality and quantity of river sections entering the sea.
2. Develop and implement a "Blue Bay" remediation and restoration plan.
3. Develop effluent discharge standards for marine aquaculture.
4. Industrial and agricultural enterprises implement a pollution discharge permit system.
5. Industrial enterprises implement indirect discharge standards for water pollutants.
6. Traceability investigation, summary list and detailed files of sewage outlets.
Agricultural non-point source pollution:
1. Soil testing formula fertilization technology, saving fertilizer and increasing efficiency; Increase the application of organic fertilizer and return straw to the field; Apply new and efficient fertilizers such as bio fertilizers; Promote the use of organic fertilizers and balanced application of nitrogen, phosphorus, potassium fertilizers, and trace element fertilizers.
2. Construct ecological ditches, sewage purification tanks, surface runoff collection tanks and other facilities.
3. Returning barren land to farmland; Protective cultivation.
4. Demonstration of intensive livestock and poultry farming; Proper management of animal waste. Urban and rural living pollution sources:
1. Build and improve the sewage treatment system; Upgrading of sewage treatment plants (stations) and monitoring of water quality.
2. Strengthen the construction of rainwater and sewage diversion pipelines; Sewage interception and collection.
3. Regular maintenance of the sewer system; Improve urban filtration, runoff infiltration, and septic tank systems.
Industrial pollution sources:
1. Key industry enterprises and centralized sewage treatment facilities shall be rectified to meet the standards; Centralized pollution control in industrial agglomeration areas; Strictly manage and impose heavy penalties, gradually eliminate heavily polluting enterprises and industries.
2. End of pipe denitrification and phosphorus removal treatment; Harmless treatment and resource utilization of solid waste; Industrial wastewater recycling.
3. Artificial wetland water purification project.
Sea discharge outlet:
Classification supervision, management, and control of discharge outlets into the sea.
Serious pollution at the mouth of the bay
Toxic and harmful new pollutants detected
The content of new pollutants such as antibiotics, microplastics, and persistent organic pollutants has increased.
Strictly implement the Stockholm Convention on Persistent Organic Pollutants and the Minamata Convention on Mercury.
1. Strengthen the supervision and punishment of illegal and irregular use of drugs in aquaculture; Harmless disposal of abandoned aquaculture cages; Use anti wind and non plastic materials such as floating balls and net cages.
2. Strengthen the control of hospital sewage and waste.
3. Strengthen coastal waste management.
Typical marine ecosystems have been damaged
There are arbitrary changes to the scope of the protected area
The marine ecological protection system is not sound, and the daily supervision of various marine protected areas is insufficient
1. Marine ecological red line system.
2. Actively create national level marine parks.
3. Strengthen law enforcement patrols.
Return the land to the sea, return the enclosure to the sea; Dismantle illegal projects and facilities in accordance with the law, and comprehensively clean up illegal occupation of protected areas, ecological red line areas, and other reclamation projects.

The retention rate of natural shorelines has decreased
Reclamation of land, construction of ports and dams, etc.
1. Strictly regulate the use of sea areas and approve marine engineering projects.
2. Strengthen law enforcement patrols.
1. Shoreline restoration, ecological seawall, artificial replanting, and artificial sand replenishment.
2. Return the land to the sea, return the enclosure to the sea.
3. Remediation of unreasonable structures.

The mudflat wetland is occupied in a large area
Sea aquaculture (planting), land reclamation, etc.
1. Strictly regulate the use of sea areas and approve marine engineering projects.
2. Strengthen law enforcement patrols.
1. Return to the beach, return to the wet, return to the sea, and return to the sea.
2. Ecological aquaculture, deepwater aquaculture, artificial reefs, and ecological reefs.
3. Construction of riparian buffer forest belt.

Decreased coral reef coverage
Human destruction, increase in harmful organisms, decline in water quality, climate change, ocean acidification, etc.
1. Establish coral reef conservation areas or national parks.
2. Strictly regulate the use of sea areas and approve marine engineering projects.
3. Implement a fishing ban period.
1. Control harmful organisms, fish and other animals on coral reefs, and strictly prohibit overfishing.
2. Transplant to increase coral population, cultivate corals, and improve coral reef substrate.
3. Prevent the invasion of alien species.

Large scale loss of mangrove forests
Reclamation of land, indiscriminate logging, and lax management.
1. Marine ecological red line system.
2. Strictly regulate the use of sea areas and approve marine engineering projects.
3. Establish mangrove conservation areas or national parks.
4. Implement a fishing ban period.
5. Strengthen law enforcement patrols.
1. Investigation of ecological environment status, capacity assessment, and dynamic monitoring.
2. Returning ponds to forests and treating wastewater from aquaculture.
3. Vegetation conservation, keeping fish and other animals in small quantities, and strictly prohibiting overfishing.
4. Artificial water replenishment, artificial planting, and prevention of invasive alien species.
5. Strictly supervise the discharge of sewage around mangrove forests.
Typical marine ecosystems have been damaged
Degradation of seagrass beds
Human destruction, land reclamation, lack of management, etc.
1. Actively create national level marine parks.
2. Strictly approve the use of sea areas and the environmental impact assessment of marine engineering.
3. Implement a fishing ban period.
4. Strengthen law enforcement patrols.
1. Return the land to the sea, return the enclosure to the sea; Remediation of unreasonable structures.
2. Control harmful organisms in seagrass beds.
3. Overfishing is strictly prohibited.
4. Transplant biological reefs.

Insufficient ecological water demand
Upstream dam construction, insufficient inflow into the sea, etc.

1. Restoration or reconstruction of degraded or disappearing wetlands through ecological technology or ecological engineering, vegetation conservation, returning farmland to wetlands, and returning fishing to wetlands.
2. Water system restoration, river dredging, embankment improvement, coastal building improvement, and artificial water replenishment.
3. Prevent the invasion of alien species.
Decline of marine biological resources
Decreased biodiversity
Overfishing, habitat loss, seawater pollution, etc.
Optimize the structure of marine fishing operations and develop implementation plans for marine biodiversity conservation within administrative regions.
Implement breeding and release, encourage the establishment of marine pasture demonstration areas using artificial reefs as carriers, bottom sowing breeding as means, and breeding and release as supplements.

The reduction of endemic species in the sea area
Overfishing, habitat loss, seawater pollution, etc.

By reducing marine fishing yields and increasing bird habitat areas, we ensure that the population of key protected species (national first and second level protected animals) within the administrative region continues to increase.

Decline of high-quality fishery resources
Overfishing, illegal fishing, trawling, etc.
Strictly implement the summer fishing ban system.
1. Strictly control the intensity of marine fishing and comprehensively clean up and ban fishing gear such as "closed door nets" that cause significant damage to fishery resources and the environment.
2. Strictly crack down on fishing "three no" vessels.

Fish migration is obstructed
Human activities, marine engineering construction, illegal fishing, etc.

Open up the upstream spawning channels of important economic fish that are blocked by roads, dams, etc., and restore the habitat of fish spawning grounds.

Degradation of spawning grounds, nursery grounds, wintering grounds, and feeding grounds
Sea water pollution, reclamation, loss of habitat, reduction of ecological water use, obstruction of channels, etc.

Intensify the investigation, research, and protection of typical marine ecosystems, as well as important fishing areas such as spawning grounds, feeding grounds, wintering grounds, and migration channels, and effectively protect important marine biological breeding grounds in the jurisdictional waters.
Frequent occurrence of ecological disasters and emergencies
Frequent occurrence of red tide, green tide, brown tide, and jellyfish blooms
Eutrophication of water bodies, overfishing, etc.
Establish a monitoring, warning, emergency response, and information dissemination system for marine red tide (green tide, brown tide) disasters within the administrative region.
1. Strengthen the monitoring and early warning of ecological disasters such as beaches and power plant water intakes, enhance public publicity, and provide early warning information to relevant enterprises and institutions.
2. Adjust the aquaculture structure and prohibit illegal marine aquaculture in ecologically sensitive and fragile areas, areas with high incidence of red tide disasters, and areas with severe pollution in accordance with the law.
3. Focus on source control and control nitrogen and phosphorus input.

Invasive alien species
Inappropriate introduction and management of alien species.

Identify the current situation and potential risks of invasive species, and take measures to prevent and control them based on their characteristics, including physical control, chemical control, biological control, ecological substitution, and community transformation.

High risk of oil spill
Outdated and poorly managed oil pipelines and other facilities, oil spills from pipelines and oil drilling platforms, ship accidents, discharge of oily wastewater from ships, and oil spills from coastal petrochemical plants and storage facilities into the sea.
1. Establish a joint emergency response mechanism for marine environmental pollution caused by oil spills, and build a comprehensive information platform for the statistics, monitoring, and retrieval of emergency materials for oil spills.
2. Establish a special inspection system for key risk sources such as coastal crude oil terminals and ships, conduct regular law enforcement inspections, and strictly investigate and punish environmental violations in accordance with the law.
3. Clarify the responsible parties for oil spill pollution control in nearshore waters and coasts, enhance the ability to identify oil spill fingerprints, improve emergency response and command mechanisms, and allocate emergency material warehouses.
1. Evaluate the pollution caused by oil spills at sea and the risk of oil spills in nearshore waters, carry out risk zoning for oil spills at sea, and prevent pollution accidents such as oil spills from occurring.
2. Residual and waste oil from ships must be recycled and prohibited from being discharged into water bodies. Strengthen on-site supervision and inspection of ship pollution prevention operations, prohibit ships from dumping garbage into water bodies, and prohibit ships from discharging excessive oily wastewater into water bodies.

Chemical leakage
Leakage during the loading, unloading, and transportation of hazardous chemicals, as well as explosions and leaks from coastal chemical plants and storage facilities into the sea.
1. Strengthen the supervision of coastal industrial development zones and enterprises involved in hazardous chemicals such as petrochemicals, chemicals, and smelting within administrative regions, and implement their main responsibilities.
2. Carry out risk assessment and zoning work for hazardous chemicals, build a risk information database, establish an information sharing mechanism, and establish government environmental emergency plans.

Public access to the sea is difficult to access
Encirclement and reclamation, as well as structural barriers, make it difficult for the public to access the sea
The reclamation of land has led to a decrease in public sea friendly space; The obstruction of structures makes it difficult for the public to access the sea.
Strictly approve the right to use the sea area.
1. Serious measures will be taken to address unauthorized expansion of the sea area.
2. Introduce relevant policies to lawfully remove illegal buildings and facilities within a certain range of the coastline towards the land, as well as unauthorized aquaculture ponds, salt ponds, fishing boat docks, etc.

The comprehensive quality of the environment, such as seaside resorts and coastal tourist resorts, is poor
Illegal or unreasonable discharge outlets into the sea have led to a decrease in water quality in the bathhouse, a large amount of plastic waste, construction waste, etc. have caused the beach to be dirty, messy, and poor, unreasonable structures have destroyed the harmony of the natural landscape, resulting in beach mudification (degradation), and management deficiencies.
1. Strengthen environmental information disclosure, public participation, and publicity, and establish a sound mechanism for sharing marine ecological environment information.
2. Organize public and social organizations to participate in marine environmental protection public welfare activities, and raise public awareness of protecting the marine environment.
1. Focus on source control and establish a long-term mechanism.
2. Resolutely close the sewage outlets, industrial sea areas, aquaculture areas, etc. near the beach.
3. Establish a "maritime sanitation" mechanism, organize relevant departments within the administrative region to jointly carry out actions to rectify garbage pollution on beaches, and be responsible for the collection and transportation of floating garbage.
4. As a "white pollution", foam floating ball should be listed as the key point of remediation, and it is prohibited to enter the sea and stop production.
5. Set up garbage interception facilities at the mouth of rivers to reduce the amount of garbage entering the sea in the basin.

Table 5 Suggestions for Planning Project Types
category
Project type
Project Content
Gulf Estuary Deterioration Action
Pollution control of rivers and estuary areas entering the sea
Dredging, dredging tidal channels, improving water quality, etc

Pollution control of discharge outlets into the sea
Investigation and treatment of discharge outlets into the sea

Comprehensive beach management
Garbage, stone removal, demolition of illegal structures, etc

Tail water treatment for aquaculture
Upgrading and renovating aquaculture facilities, managing aquaculture in prohibited areas, etc

Prevention and Control of Marine Pollution Sources
Elimination of old ships, standardization renovation of ships, construction of sewage and garbage facilities at ports and docks, recycling of pollutants from drilling platforms, and construction of treatment facilities, etc
Important habitat protection and restoration actions
Natural shoreline protection and restoration
Artificial sand replenishment, vegetation sand fixation, beach restoration (wet), dike opening and sea access, demolition of artificial structures, etc

Protection and restoration of coastal wetlands
Returning salt to the beach, replanting wetland vegetation, restoring wetland vegetation communities, planting thick vegetation, habitat conservation, removal of invasive alien species, etc

Mangrove Conservation and Restoration
Mangrove cultivation, replanting, and restoration, etc

Seaweed bed protection and restoration
Transplantation, replanting, and restoration of seagrass

Coral Reef Ecological Protection and Restoration
Artificial transplantation and planting, coral reef biological proliferation and release, rescue and maintenance, etc

Protection and restoration of estuarine wetland ecosystem
Construction of riverfront belt at the estuary of the sea, restoration of aquatic vegetation, wetland construction, etc

Ecological environment governance and restoration of islands
Improvement of island beaches and shorelines, restoration of island vegetation, restoration of island mountains, pollution control, upgrading of sewage treatment facilities, etc
Construction of risk prevention and emergency response system
Marine environmental risk prevention
Construction of early warning system, upgrading and transformation of equipment technology, etc

Emergency response to sudden environmental incidents
Construction of high-risk area warning and forecasting system, dispatch platform, emergency monitoring system, etc
Building basic monitoring and regulatory capabilities
Monitoring capability
Construction of ecological environment monitoring and early warning system in nearshore waters, construction of three-dimensional dynamic cruise monitoring system in jurisdictional waters, etc

Regulatory capability
Construction of monitoring technology and regulatory system for marine discharge outlets, and capacity building for off-site supervision of marine dumping areas, etc

Detailed investigation of basic information on marine ecological environment
Regularly conduct detailed surveys of basic information on regional marine ecological environment
（6） Develop policy measures
To ensure the achievement of planning goals and tasks, establish and improve marine ecological environment protection mechanisms from organizational leadership, regulatory standards, economic policies, technological support, supervision and management, and public participation.
Organizational leadership. Propose an organizational system to ensure the implementation of the plan, establish a responsibility list for marine ecological environment protection for all levels of government and relevant departments involved in the implementation and execution of the plan.
Regulatory standards. Based on the needs of marine ecological environment protection, propose suggestions on relevant laws, regulations, standards and specifications.
Policy system. Propose incentive policies and systems for marine ecological environment protection, clarify the economic policies and related requirements to be implemented in each sea area for marine ecological compensation, damage compensation, etc.
Capacity building. According to the responsibilities of marine ecological environment protection and supervision management, a list of fundamental and critical capacity building for strengthening marine ecological environment governance capabilities is proposed in priority order.
Technological support. Special research will be conducted on the marine ecological environment problems and their formation mechanisms in key bays and estuaries, including eutrophication and the prevention of ecosystem degradation, to provide technical support for scientific management.
Supervision and management. Propose a supervision and management mechanism to ensure the smooth implementation of the plan, and clarify supervision and management measures such as marine ecological environment supervision, land-based pollution supervision, and offshore pollution supervision.
Public participation. Clearly define the requirements for information disclosure in planning, carry out publicity and education on marine ecological environment protection, encourage public participation, strengthen social supervision, and mobilize the entire society to participate in marine ecological environment protection work.
3、 Work achievement requirements
On the basis of research, coastal cities have compiled the "Research Report on Prominent Issues of Marine Ecological Environment in Coastal Cities (Key Bays and Estuaries)" and "Planning" texts for each city. At the provincial level, they have summarized and formed the "14th Five Year Plan for Marine Ecological Environment Protection Situation and Tasks Research Report" and the provincial "Planning" text (see attachments 1 and 2).
Attachment 1
Outline of the Research Report on the Situation and Tasks of Marine Ecological Environment Protection in Liaoning Province during the 14th Five Year Plan Period
1、 Basic characteristics and challenges of regional marine ecological environment
Comprehensively review the economic development and industrial layout of our province or coastal cities, analyze the marine ecological environment characteristics of key areas such as bays and estuaries within the administrative region, and analyze the current situation facing marine ecological environment protection.
（1） Regional economic development, industrial layout, and major strategic deployment
（2） Main natural environmental characteristics of bays and estuaries
（3） Discharge status of rivers entering the sea and sewage outlets
（4） Current situation of marine protected areas (marine parks) at all levels and types
（5） Analysis of the current situation of public pro sea space
2、 The effectiveness and shortcomings of marine ecological environment protection during the 13th Five Year Plan period
Summarize and analyze the achievements and shortcomings in marine ecological environment protection during the 13th Five Year Plan period, as well as the replicable and promotable experience models formed by the comprehensive governance battle in the Bohai Sea.
（1） Achieve results
（2） Experience insights
（3） There are gaps and shortcomings
3、 The prominent problems and causes of marine ecological environment protection
Based on the main bays and river mouths of coastal cities, summarize and analyze the prominent problems in marine ecological environment protection in different regions, as well as the socio-economic and management roots of the problems, and predict the future trends of change.
（1） The problem and causes of marine environmental pollution
（2） The problem and causes of marine ecological degradation
（3） Risk and Causes of Marine Environmental Accidents
（4） Public coastal and pro sea issues and their causes
（5） Shortcomings and Causes of Marine Regulatory Capability
4、 Objectives and Countermeasures for Marine Ecological Environment Protection during the 14th Five Year Plan Period
（1） Marine ecological environment protection goals during the 14th Five Year Plan period
Guided by the strategic deployment of the "Two Centenary Goals" and the goal of building a beautiful China, based on the characteristics and needs of marine ecological environment protection in coastal cities, and in response to the prominent problems in the current marine ecological environment, we propose planning goals and specific indicators for preventing and controlling marine pollution, improving marine environmental quality, protecting biological ecology, risk prevention and control, and enhancing governance capabilities in coastal cities and key bays and estuaries.
（2） Main tasks, major projects, and proposed countermeasures
In response to the characteristics and prominent problems of coastal cities, especially key bays and major river mouths, the main tasks, major engineering measures, and differentiated countermeasures for improving marine environmental quality, curbing marine ecological degradation trends, restoring fishery resources, maintaining marine ecological security, and improving marine ecological environment monitoring capabilities during the 14th Five Year Plan period are proposed.
5、 Supporting materials
1. Research Report on Typical Cases of Regional Marine Ecological Environment Protection
2. Trend chart of interannual variation of regional marine environmental quality
3. Vector diagram of the distribution of major rivers and sewage outlets entering the sea
4. Vector map of distribution of marine protected areas at all levels and types
5. Vector map of natural shoreline distribution
6. Distribution map of typical ecosystems such as coastal wetlands, coral reefs, seagrass beds, and mangroves
7. Distribution vector diagram of beach areas
8. Vector map of distribution of different types of marine aquaculture areas
9. Distribution map of important marine fishery areas under the "Three Fields and One Channel" policy
10. Vector map of ecological protection red lines for land and sea areas
11. Coastal Industry Layout Map
Attachment 2
Outline of the 14th Five Year Plan for Marine Ecological Environment Protection in Liaoning Province

1、 Basic characteristics and challenges of marine ecological environment in Liaoning Province
Comprehensively review the economic development and industrial layout of coastal cities, analyze the marine ecological environment characteristics of key areas such as bays and river mouths within the jurisdiction, and analyze the current situation facing marine ecological environment protection.
1. Characteristics of marine natural environment
2. Regional economic development and industrial layout
3. Overview of Marine Resources
4. Current situation of marine protected areas (marine parks) at all levels and types
5. Analysis of the current situation of public pro sea spaces
2、 The effectiveness and shortcomings of marine ecological environment protection during the 13th Five Year Plan period
Summarize and analyze the achievements and shortcomings of coastal cities in marine ecological environment protection during the 13th Five Year Plan period, as well as the replicable and promotable experience models formed by the comprehensive control of pollution in the Bohai Sea.
1. Achieve results
2. Experience inspiration
3. There are gaps and shortcomings
3、 The prominent problems and causes of marine ecological environment protection
Based on the main bays and estuaries of coastal cities, summarize and analyze the prominent problems in marine ecological environment protection in different regions, as well as the economic, social, and management roots of the problems, and predict the future trends of change.
1. Quality of marine ecological environment
2. Typical marine ecosystems
3. Marine biological resources
4. Ecological disasters and emergencies
5. It is difficult for the public to get close to the sea
6. Shortcomings and causes of marine regulatory capabilities
4、 Identification of key area control units
Under the guidance of the national technical outline, based on the characteristics of the marine ecological environment in Liaoning Province, and highlighting the "Three Bays and One Mouth" (Liaodong Bay, Jinpu Bay, Dalian Bay, Yalu River Mouth), combined with Liaoning Province's "Bay Chief System" action plan, the identification of key control units will be carried out.
5、 Overall planning concept
1. Guiding ideology
2. Basic principles
3. Planning scope and timeline
6、 Planning objectives and indicators
（1） Conventional indicators
1. Improvement of marine environmental quality
(1) Proportion of excellent water quality in nearshore waters and key bays
2. Ecological protection of marine organisms
(1) Natural shoreline retention rate
(2) Length of shoreline restoration
(3) Restoration and restoration area of coastal wetlands
（2） Regional characteristic indicators
1. Improvement of marine environmental quality
(1) The degree of decline in eutrophication in major river mouths
(2) Water quality compliance rate of beach
2. Ecological protection of marine organisms
(1) Population size of key protected species
(2) Restoration area of wetlands such as reeds
3. Other characteristic indicators
7、 Main tasks
Propose planning tasks based on key control units in terms of improving marine environmental quality and protecting marine biological ecology. On this basis, provincial departments and coastal cities propose targeted task measures based on regional characteristics and industry differences.
1. Improvement of marine environmental quality
2. Ecological protection of marine organisms
3. Marine environmental accidents and risk prevention
4. Improve public sea friendly spaces
5. Enhance marine regulatory capabilities
8、 Key projects
According to the planning objectives, fully connect with the industry planning of various functional departments related to the sea, and based on the actual situation of each city, propose a detailed project list and project analysis report from bottom to top through in-depth research, including the necessity of project implementation, accurate construction location, construction scale and objectives, main content, project performance, implementation deadline, etc., and calculate the project task volume and investment demand. Prioritize based on factors such as the demand for marine ecological environment governance and project maturity.
9、 Policy measures
Composition Plan of the Leading Group, Office, and Technical Guidance Group for the Compilation of the 14th Five Year Plan for Ecological Environment Protection in Key River Basins and Sea Areas in Liaoning Province

In order to implement the requirements of the Environmental Protection Law of the People's Republic of China, the Water Pollution Prevention and Control Law of the People's Republic of China, and the Marine Environment Protection Law of the People's Republic of China, and to do a good job in the preparation of the 14th Five Year Plan for Ecological Environment Protection of Key River Basins and Sea Areas in Liaoning Province (hereinafter referred to as the "Plan"), and effectively strengthen the organization and leadership of the preparation of the Plan, with the consent of the provincial government, the Provincial Department of Ecology and Environment, together with relevant departments such as the Provincial Development and Reform Commission, the Provincial Department of Natural Resources, the Provincial Department of Water Resources, and the Provincial Department of Housing and Urban Rural Development, has established a leading group, office, and technical guidance group for the preparation.
1、 Leadership Group
（1） Main responsibilities
Responsible for coordinating and deploying various tasks related to the preparation of the "Plan", reviewing the outline and final text of the "Plan", reviewing major policies and key engineering projects in the preparation of the "Plan", and coordinating and resolving major issues in the preparation of the "Plan".
（2） Personnel composition
Team leader: Hu Tao, Director of the Provincial Department of Ecology and Environment
Deputy Team Leader: Wei Yongqing, Deputy Director of the Department of Ecology and Environment of the Province
Deputy Director of the Development and Reform Commission of Huangyang Province
Yang Bin, Deputy Director of the Department of Natural Resources of Province
Feng Dongxin, Deputy Director of the Provincial Water Resources Department
Member: Wang Xuelai, Deputy Director of the Provincial Department of Science and Technology
Deputy Director of the Department of Industry and Information Technology of Pengyi Province
Zou Dapeng, Deputy Director of the Provincial Department of Finance
Deputy Director of Housing and Urban Rural Development Department of Jieyu Province
Cao Wenbin, Deputy Director of the Provincial Department of Transportation
Li Dehai, Deputy Director of the Department of Agriculture and Rural Affairs of the Province
Chen Yanlan, Deputy Director of the Provincial Health Commission
Sun Yizhong, Deputy Director of Forestry and Grassland Bureau of Province
Li Guanghui, Deputy Director of Liaoning Maritime Safety Administration
Sun Zhanxiang, Vice President of the Provincial Academy of Agricultural Sciences
Chief Engineer of Jin Zhaohui Provincial Water Resources Management Group Co., Ltd
2、 Leadership Group Office
（1） Main responsibilities
Responsible for implementing the requirements of the leadership group, guiding the specific work of preparing the "Plan", and coordinating the resolution of relevant issues in the preparation of the "Plan". The office is located in the Provincial Department of Ecology and Environment.
（2） Personnel composition
Director: Wei Yongqing, Deputy Director of the Department of Ecology and Environment of the Province
Deputy Director: Dong Zhigang, Chief Nuclear Safety Engineer of the Provincial Department of Ecology and Environment
Member: Li Yong, Director of the Regional Economic Department of the Provincial Development and Reform Commission
Yu Dongmei, Deputy Director of the Social Development Science and Technology Department of the Provincial Department of Science and Technology
Liu Shaoguo, Director of the Resource Conservation and Comprehensive Utilization Department of the Department of Industry and Information Technology of the Province
Director of the Natural Resources and Ecological Environment Department of the Finance Department of Wang Daye Province
Ren Shaohong, Director of the Land and Space Planning Department of the Natural Resources Department of Shaohong Province
Li Guojun, Director of the Comprehensive Department of the Provincial Department of Ecology and Environment
Xu Guang, Director of the Science and Finance Department of the Department of Ecology and Environment of Guangdong Province
Liu Cuiling, Director of the Administrative Approval Department of the Provincial Department of Ecology and Environment
Director of Water Ecological Environment Department, Department of Ecology and Environment, Tianbo Province
Li Jinlong, Director of the Marine Ecological Environment Department of the Provincial Department of Ecology and Environment
Sun Chunjie, Director of the Water Source Supervision Department of the Provincial Department of Ecology and Environment
Deng Chunkai, Director of the Soil Ecological Environment Department of the Provincial Department of Ecology and Environment
Wang Xiaochen, Director of the Agricultural Environmental Protection Department of the Provincial Department of Ecology and Environment
Director of the Service Industry Environmental Protection Department of the Ecological Environment Department of Gaoqixing Province
Wang Xiaodong, Director of the Ecological Environment Monitoring and Emergency Department of the Ecological Environment Department of Dong Province
Secretary of the Party Committee of Hejun Province Ecological Environment Protection Technology Center
Yuan Junbin, Secretary of the Party Committee of the Provincial Ecological Environment Affairs Service Center
Secretary of the Party Committee of Xu Xuepeng Provincial Ecological Environment Monitoring Center
Shang Haitao, Deputy Director of the Planning and Finance Department of the Provincial Water Resources Department
Zhou Tianran, Director of the Public Utilities Department of the Housing and Urban Rural Development Department of the province
Wang Rui, Deputy Director of the Comprehensive Planning Department of the Provincial Department of Transportation
Yang Xuesong, a department level official in the Policy and Regulations Department of the Agriculture and Rural Affairs Department of Yang Xuesong Province
Zhang Xuan, Director of the Disease Prevention and Control Department of the Provincial Health Commission
Zhang Xiaodong, Deputy Director of Grassland and Wetland Management Department of Forestry and Grassland Bureau of Guangdong Province
Han Junsong, Director of the Hazardous Management and Pollution Prevention Department of Liaoning Maritime Bureau
Wang Hui, Director of the Research Management Department of the Provincial Academy of Agricultural Sciences
Xu Haijun, Director of Dispatch Center of Provincial Water Resources Management Group Co., Ltd
The Director of the Ecological Environment Law Enforcement Bureau of the Provincial Department of Ecology and Environment is a member of the leadership group office.
3、 Technical Guidance Group
（1） Main responsibilities
Responsible for implementing the requirements of the leadership group and office, organizing the preparation of guiding documents for the 'Plan', and submitting the results of the 'Plan' on time; Promote the work of various cities and relevant departments and bureaus.
（2） Personnel composition
Team leader: Dong Zhigang, Chief Nuclear Safety Engineer of the Provincial Department of Ecology and Environment
Deputy Team Leader: Jiang Xiaogang, Chief Planner of the Provincial Water Resources Department
Wang Chunlei, Deputy Director of the Natural Resources and Ecological Environment Department of the Provincial Department of Finance
Liu Lanxin, Deputy Director of the Provincial Ecological Environment Protection Technology Center
Researcher at Ma Tingyu Province Urban and Rural Construction Planning and Design Co., Ltd
Vice President of Songlun Institute of Marine Fisheries Science
Zhang Xiaoyun, Vice President of Shenyang Planning and Design Institute Co., Ltd
Member: Zhang Zheng, Deputy Director of the Provincial Ecological Environment Monitoring Center
Liang Shuxiu, Senior Engineer at Dalian University of Technology
Deputy department level cadre of the Housing and Urban Rural Development Department of Gaohan Province
Senior Engineer of Zhangning Provincial Transportation Affairs Service Center
Yang Zuosen, Director of the Provincial Center for Disease Prevention and Control
Yang Chunming, Deputy Director of the Provincial Forestry Development Service Center
Chen Yichun, Pollution Prevention Supervisor of the Hazardous Prevention Department of Liaoning Maritime Bureau
Yan Fanchen, Deputy Chief Engineer of Provincial Water Resources and Hydropower Survey and Design Institute Co., Ltd
Wang Liusuo, Senior Engineer at the Provincial Ecological Environment Protection Technology Center
Senior Engineer of Wanghe Province Ecological Environment Protection Technology Center
Cheng Xilei, Senior Engineer at the Provincial Ecological Environment Protection Technology Center
Zhu Yue, Senior Engineer of the Ecological Environment Protection Technology Center in Zhu Yue Province
Wang Xiu, Senior Engineer at the Provincial Ecological Environment Protection Technology Center
Level 8 ordinary management position of Li Guoyu Provincial Ecological Environment Affairs Service Center
Eighth level ordinary management position at Ma Weifeng Provincial Ecological Environment Affairs Service Center
Wang Peng, Senior Engineer at the Ecological Environment Affairs Service Center of Province
Senior Engineer of Taoye Province Ecological Environment Affairs Service Center
Senior Engineer of Luyan Province Ecological Environment Monitoring Center
Engineer of Huitingting Provincial Ecological Environment Monitoring Center